Calendars, guides and practical tips for exhibitors and stand-building contractors.
The factors that determine the price: construction system, size, design and assembly deadlines.
Comparing the four most common systems and when to choose each one.
What changes compared to a trade fair: deadlines, protocols and specific spaces.
What to decide and book week by week before exhibiting for the first time.
Real timelines by construction system, to plan the right margin.
What documentation each Spanish trade fair venue requires before building.
The most frequent mistakes that lead to penalties, and how to avoid them.
Regulations, deadlines and logistics when taking your stand to Germany, France or Italy.
How to design and build a congress reception area well.
How to reduce assembly's environmental impact by choosing the right construction system.
Dates, assembly deadlines and what you need to know before taking your stand to the International Tourism Trade Fair at IFEMA.
Differences between reinforcing your team with fitters by the day or delegating the whole project, and when each option makes sense.
What changes compared to a single-storey stand: certified technical project, loads, deadlines and documentation required.
What the fitter's insurance covers and what the exhibitor's covers, and why they're two separate policies.
Corner, in-line or island: what to consider when choosing your stand's location within the hall before designing it.
What to expect if you build your stand at Alimentaria, at the Gran Via venue of Fira de Barcelona.