Guide · Assembly deadlines

HOW LONG DOES IT TAKE TO BUILD A STAND?

Trade fair venues assign a specific time window for assembly, usually between one and three days before opening. Knowing how much time your stand actually needs avoids last-minute surprises — and penalties if you don't finish on time.

Modular systems: the fastest assembly

Octanorm and modular aluminium systems like Aluvision and Bematrix snap together or click into place, with no tools. A small-to-medium stand can be built in one day; a large one with double height or lots of furniture needs more days, but it's still faster than an equivalent in wood.

Custom woodwork: allow more margin

Every piece of a wood construction is manufactured for that specific design and installed individually on-site, with adjustments made on the spot. This multiplies assembly time compared to an equivalent modular system, especially if there are unique elements (curves, double heights, non-standard built-in furniture).

What else extends the timeline

What to do if the deadline is very tight

If your assembly window is short — common at congresses and events at non-trade-fair venues (guide in Spanish) — the solution isn't to work faster with the same team, but to add hands: reinforce specifically with staff for hire for those particular days, with no need to hire permanent staff.