Price calculator · 2026

HOW MUCH DOES IT COST TO BUILD A STAND?

Under 300m²: charged per 8h working day per technician (€230/day). 300m² or more: per square metre, depending on structure. Fill in the details and the breakdown calculates itself.

2,500+ Stands built across Spain and Europe
72h Maximum quote response time
8h Length of each assembly day

1. Stand size

Labour per day (stands < 300m²)

Indicative: for an exact number of technicians/days needed, request a quote — it depends on design complexity.

2. Extras

Counter
€5.00/unit
Table + 4 chairs
€5.50/unit
Display case 1m × 50cm
€5.00/unit

Storage space

3. Travel

The first 50 km have no extra cost. Beyond that, €0.50/km — fuel, the team's daily allowance and, if an overnight stay is needed, the hotel are quoted separately.

Request a real quote with these details

Indicative breakdown

Subtotal€0
VAT (21%)€0
Estimated total€0

Indicative 2026 prices, excluding VAT unless stated otherwise. Does not include fuel, daily allowance or team accommodation where applicable.

How the price is calculated

Frequently asked questions

Why is the price different depending on the stand's size?

On small stands, the main cost is labour (assembly and dismantling), so it's charged per technician day. On large stands, material and structure weigh more in the total cost, so it's charged per square metre there instead.

How much does a 200m² stand cost?

Being under 300m², it's calculated per technician day (8-hour days). With a team of 3 technicians working 3 days, for example, that would be 3 × 3 × €230 = €2.070 indicative, excluding VAT and extras. The actual number of technicians/days depends on design complexity.

What if the venue is very far away?

Up to 50 km there's no travel cost. Beyond that, €0.50/km is charged, and fuel for the trip, the team's daily allowance and, if an overnight stay is needed, accommodation are quoted separately.

How long does one assembly day last?

One day equals 8 hours of work by one technician. The rate of €230 per day (stands under 300m²) is multiplied by the number of technicians and days the assembly needs.

How quickly do I receive the quote?

Within a maximum of 72 business hours from telling us about your project — usually sooner.

How much does storage space for the stand cost?

The 1×1 m storage space has a base price of €14.00. Each additional square metre adds €5.00 more — for example, a 5×1 m (5 m²) one costs €34.00. All excluding VAT.

Shall we talk about your project?

REQUEST YOUR REAL QUOTE

The calculator is indicative — tell us about your project and we'll send you an exact quote within a maximum of 72 business hours.

Request a quote
Message us