8:00 am on the first day of the fair. Doors open in two hours and something isn't ready. At that moment only one thing matters: fixing it fast and well. We handle last-minute issues at IFEMA Madrid and other venues, whether or not we built the stand ourselves.
Loose panels, uneven structure, or elements that didn't fit as in the original design.
Lights that won't turn on, screens that won't load, poorly connected or insufficient power boards.
Peeling vinyl, poorly fitted tension graphics, or lifted carpet in walkway areas.
Express removal when material hasn't left within the venue's time window.
Yes. A good part of the emergency calls we handle are for stands built by another contractor or by the exhibitor themselves. The original build doesn't need to be ours.
Yes, the emergency service carries a surcharge over the standard assembly price, which we confirm by phone or WhatsApp before heading over.
Since we work regularly inside the main trade fair venues, response time is usually under two hours during active fair days, depending on the venue and team availability.
Hall, stand number and a brief description of the problem. If the venue requires specific accreditation for the call-out, we'll let you know when confirming the team.
Hall, stand number and what happened. We confirm team and estimated arrival time right away.
Talk on WhatsApp